Concept Design

Manufacturing

For manufacturers linking production genealogy, engineering changes and supplier evidence across equipment or plants with different systems.

Concept Design

Finding finished lots affected by rework from an earlier batch

An ERP can identify the scheduled ingredients for a run while a supervisor records actual rework on a line sheet. When an ingredient is withdrawn, the direct batch history may omit a later run containing that rework.

System landscape

Source evidence comes from actual batch and rework issues. The proposed workflow sends the decision to site quality manager.

Proposed architecture

Link issued material, actual consumption, rework creation, rework consumption and packed outputs. Retain the source system and unit at every split. Build both forward tracing from raw material and reverse tracing from finished pack.

Event sequence Select a step for details
  1. Source recordsActual batch and rework issues
  2. ProcessingBuild lot genealogy
  3. Decision ownerSite quality manager
  4. Operational outputScoped recall and hold

Reliability and operating controls

Quarantine unlinked rework and unexplained quantity differences. The quality manager controls the hold boundary and can widen it where evidence is incomplete.

Illustrative operating scenario

Trim from Tuesday is reintroduced on Thursday after a product changeover. The trace follows the intermediate rework lot into Thursday’s finished orders, including a part batch already dispatched.

Delivery boundaries

The plant controls engineer owns PLC, SCADA and local commissioning. The delivery scope covers operational and enterprise records and their interfaces.

Expected business impact

Improve the speed and accuracy of hold decisions when finished lots contain intermediate rework.

Acceptance test and handover

Run a mock recall involving rework, scrap and an intersite transfer. Compare the affected-customer list with dispatch documentation and account for stock physically held at the plant.

Industry evidence

The recall protocol describes identification of affected food, distribution records, business contacts and recall follow-up. FSANZ Food Industry Recall Protocol

GS1 describes how businesses establish traceability across trading partners and their internal processes. GS1 Australia on implementing traceability

Concept Design

Managing old and new product specifications on the same line

Engineering approves a packaging or formulation change on a date. Old packaging stock can remain at a co-packer while the product catalogue, artwork library and production orders move to different revisions.

System landscape

Source evidence comes from specs, artwork and inventory. The proposed workflow sends the decision to quality and engineering.

Proposed architecture

Map specification revision, approved artwork, trade-item identifier and site stock to the production order. Make the allowed combinations explicit for each market and effective lot.

Event sequence Select a step for details
  1. Source recordsSpecs, artwork and inventory
  2. ProcessingResolve allowed combinations
  3. Decision ownerQuality and engineering
  4. Operational outputSite release instruction

Reliability and operating controls

Quality approves substitutions and the transition plan. Keep a blocked state for ambiguous combinations; a current file in the artwork library cannot retrospectively authorise packaging already used.

Illustrative operating scenario

The new carton reaches one site early. A second site still holds the previous label. The planner can see which combinations each site may run and where stock needs rework or return.

Delivery boundaries

The plant controls engineer owns PLC, SCADA and local commissioning. The delivery scope covers operational and enterprise records and their interfaces.

Expected business impact

Reduce downtime and rework caused by a mismatch between actual packaging and the authorised run.

Acceptance test and handover

Trace the first accepted lot and last outgoing lot at each site. Test overlapping stock, export variants and a change withdrawn after orders have been released.

Industry evidence

GS1 sets decision rules for trade-item identification when a product or its packaging changes. GS1 GTIN Management Standard

FSANZ explains how food-service businesses obtain, maintain and communicate accurate allergen information. FSANZ guidance for the food-service industry

Concept Design

Getting modified plant back into the maintenance programme

A machine modification may be signed off as a project while its maintenance tasks, parts list and operating instructions still describe the old assembly. The next service can arrive with the wrong component or isolation reference.

System landscape

Source evidence comes from modification and asset tag. The proposed workflow sends the decision to engineering and maintenance.

Proposed architecture

Cross-reference the change request, asset hierarchy, commissioning records, approved instructions and maintenance plan. Track which downstream records require revision and whether the authorised owner accepted them.

Event sequence Select a step for details
  1. Source recordsModification and asset tag
  2. ProcessingTrace affected records
  3. Decision ownerEngineering and maintenance
  4. Operational outputAccepted maintenance handover

Reliability and operating controls

Engineering controls technical acceptance. Missing instructions or an unresolved safety issue remain visible to the responsible person; closing the project cost code must not release the asset.

Illustrative operating scenario

A replacement drive is commissioned under a new part number. The planner sees that the preventive job and store catalogue still reference the retired drive before issuing the next work order.

Delivery boundaries

The plant controls engineer owns PLC, SCADA and local commissioning. The delivery scope covers operational and enterprise records and their interfaces.

Expected business impact

Get the new component, instructions and parts into the next scheduled maintenance visit.

Acceptance test and handover

Trace one physical asset from the modification to the next service. Test a temporary modification and rollback, including reissuing the correct work instructions.

Industry evidence

The model code covers plant across its lifecycle, including installation, commissioning, alteration and maintenance. Safe Work Australia on plant risk management